
The construction for I-81 began in the late 1950′s, after the Federal-Aid Highway Act of 1956. The elevated portion of the highway through downtown was completed in the 1960′s after the then current Mayor and city engineer worked with the state to shift it three blocks eastward.
Comments are closed.