IMG_1694_save the date 2012

Save the date for...

The SMTC will host a public meeting for The I-81 Challenge on Wednesday, May 9, 2012 from 2:00 p.m. until 8:00 p.m. at the Oncenter in downtown Syracuse. You can drop in any time that is convenient for you.  Please save the date! Meeting attendees will have the opportunity to: - Review materials from the May 2011 workshop - See the feedback received in May 2011 and learn how this feedback was developed into initial strategies for I-81 - Provide feedback on the initia...

Read More
WP Blast Blog IMG_1650

White Paper...

The Public Participation Program for The I-81 Challenge has allowed us to gather feedback from the public through: - Meetings with the three committees involved in The I-81 Challenge - The Study Advisory Committee - The Community Liaison Committee - The Municipal Liaison Committee - Focus groups - Two questionnaires - First series of public workshops - Outreach to populations with Limited English Proficiency - Small group community meetings How does all this input fit...

Read More
PPl and boards_IMG_1733

The I-81 Challenge...

As you may be aware, the SMTC and the NYSDOT hosted the first series of public workshops for The I-81 Challenge this past spring.  The I-81 Challenge May 2011 Public Workshops Summary Report summarizes the findings and input from those workshops. You can now download and read the full summary on our website. “Our report makes interesting reading,” said Meghan Vitale, SMTC Principal Transportation Planner. “Community opinion is fairly evenly divided between keep...

Read More
Newsletter Header_Fall 2011

»

Read More
Rte 79_Doug Kerr via Flickr Creative Commons

This past Spring, Massachusetts Department of Transportation (MassDOT) presented the preferred alternative for the Rte 79/I-195 Interchange Improvement Project to the public. The alternative consists of removing the elevated Rte 79 viaduct and building an at-grade roadway, utilizing some existing surface streets. The goal of this solution is to lower ramps to street level, and improve connections between Falls River’s downtown and waterfront areas, »

Read More
AERIAL SHOT_IMG_0199_sm

On Wednesday, November 2nd, James D’Agostino and Meghan Vitale of SMTC and William Egloff of NYSDOT answered questions from Post-Standard readers about The I-81 Challenge and the public’s proposed ideas for the future of the highway during a live Q&A session. You can learn more about the Q&A session and read the full transcript on the Post-Standard website.

Read More
Safety_Congestion_Design Deficiencies_Dots and new key_WEB-01-01-01

At the public workshops this past May, attendees had the opportunity to share their ideas about deficiencies on I-81 by writing down any issues they felt needed to be addressed and then placing their notes in the appropriate location on a large map of the I-81 corridor. How do their ideas match up with the traffic, safety, and design deficiencies identified in the NYSDOT’s Technical Memorandum #1: Physical Conditions Analysis? The I-81 Challenge »

Read More
PPl and boards_IMG_1733

As you may be aware, the SMTC and the NYSDOT hosted the first series of public workshops for The I-81 Challenge this past spring.  The I-81 Challenge May 2011 Public Workshops Summary Report summarizes the findings and input from those workshops. You can now download and read the full summary on our website. “Our report makes interesting reading,” said Meghan Vitale, SMTC Principal Transportation Planner. “Community opinion is fairly evenly »

Read More
Cincinnati_via Flickr by Latvian98

This is the final in a series of posts that explores the three major themes that arose from the visions shared at our first round of public workshops. We’ve already explored the first two major themes in previous blog posts: Rebuild the Viaduct, and Remove the Viaduct . This post explores the third and final major theme: Replace the Viaduct. The major ideas within this theme were to replace the viaduct with a below grade highway – either in a »

Read More
Octavia w Bikes_Steve at Nelson-Nygaard

This is the fifth post in a series that highlights the public’s opinion about case studies from other cities. To read other posts in this series, click here. In this post we’ll look at Octavia Blvd. in San Francisco. To learn more about that project, click here. Here are a few of the key aspects that workshop attendees liked about this case study: - Promotion of alternative modes of travel – Octavia Boulevard was seen as embracing a “Complete »

Read More
Octavia_by Steve at Nelson Nygaard

This is the second in a series of posts that explores the three major themes that arose from the visions shared at our first round of public workshops. In our last post in this series, we explored the first major theme: Rebuild the Viaduct. This post explores the second theme: Remove the viaduct and replace it with an urban boulevard or other thoroughfare integrated into the local street network.  The primary goals of most of the visions within this »

Read More
183 Austin_Flickr Nuevo Anden_Cropped

At the first round of public workshops, members of the public shared many visions for the futures of I-81. In previous posts we’ve shared a few of their individual drawings and ideas. While the ideas that meeting attendees proposed at the workshops varied significantly, the visions generally fell into three major categories: - Rebuild the viaduct - Remove the viaduct and replace it with an urban boulevard - Replace the viaduct with a below grade »

Read More